| 2011-2013 MINOR WORKS PROJECT REQUESTS - PRESERVATION AND PROGRAMMATIC | ||||||
| Category request levels as approved by June 2010 BOT | ||||||
| FORM NUMBER | BLDG | Rec. Ranking | Requested Funding | Recommended Funding | PROJECT DESCRIPTION | COMMENTS/QUESTIONS |
| Preservation Projects - Facilities Preservation subcategory | ||||||
| 471287 | College Hall | 1 | 1,029,000 | 1,029,000 | Replace clay tile roof | |
| 471316 | Wilson Library | 2 | 378,000 | 378,000 | Replace main electrical service switchgear | |
| 471323 | Arntzen Hall | 3 | 230,000 | 230,000 | Replace main electrical service switchgear | |
| 471418 | Administrative Services | 4 | 1,023,000 | 1,023,000 | Central Machine Room infrastructure improvements | Verify new number with structural added. |
| 471332 | Environmental Studies | 5 | 118,000 | 118,000 | Replace electrical branch panels | |
| 471421 | Performing Arts | 6 | 0 | 0 | Exterior renovation | Higher ranked and reduced to zero because of intermediate request |
| 471338 | College Hall | 7 | 320,000 | 320,000 | Minor tuckpointing & brick sealing | |
| 471347 | Multiple Buildings | 8 | 374,000 | 374,000 | Restroom renewal in multiple buildings | |
| 471353 | Multiple Buildings | 9 | 110,000 | 110,000 | Replace condensate receivers at WL, OM & PA | |
| 471361 | Eng. Technology | 10 | 250,000 | 250,000 | Correct 3rd floor ventilation problems | |
| 471366 | Multiple Buildings | 11 | 213,000 | 213,000 | Phase 1 replacement of pneumatic controllers with DDC system | |
| 479376 | Fairhaven College | 12 | 35,000 | 35,000 | Paint exterior of Fairhaven College (1/3 total cost) | |
| 471381 | Eng. Technology | 13 | 505,000 | 505,000 | Comprehensive exterior renovation | |
| 471385 | Shannon Point | 14 | 272,000 | 272,000 | Replace roof and add insulation | |
| 471393 | Multiple Buildings | 15 | 81,000 | 81,000 | Exterior renovation of CA & HR | Removed HS due to potential demolition |
| 471405 | Multiple Buildings | 16 | 30,000 | 30,000 | Retrofit T-12 lighting | |
| 471408 | High Street | 17 | 375,000 | 375,000 | Demolish High Street Hall | Requires relocation of occupants |
| 467659 | Biology Building | 18 | 280,000 | 280,000 | Environmental Room Upgrades to BI 163, 247, 332, 346, 439 & 464 | |
| 465048 | Fine Arts | 19 | 27,000 | 27,000 | Painting Studio plumbing | Portion of bundled project |
| 471424 | Wilson Library | 20 | 335,000 | 335,000 | Replace clay tile roof | |
| 471438 | Haggard Hall | 21 | 203,000 | 203,000 | Refurbish roof | |
| 471415 | Hannegan Road | 22 | 223,000 | 223,000 | Demolish Hannegan Road Residence | |
| 471445 | Chemistry Building | 23 | 0 | 0 | Final phase of exterior renovation | Exterior already complete |
| 471483 | Steam Plant | 24 | 65,000 | 65,000 | Replace roof over 2nd floor offices | |
| 471488 | Multiple Buildings | 25 | 270,000 | 270,000 | Replace blinds in numerous buildings | Includes 471040 & 463834 |
| 471496 | Arntzen Hall | 26 | 56,000 | 0 | Replace linoleum in restrooms | |
| 471501 | Shannon Point | 27 | 395,000 | 0 | Replace main electrical service switchgear | |
| 471503 | Fraser Hall | 28 | 290,000 | 0 | Upgrade HVAC systems | |
| 471508 | Fraser Hall | 29 | 110,000 | 0 | Comprehensive interior renovation | |
| 471511 | Performing Arts | 30 | 40,000 | 0 | Restroom renewal | |
| 471519 | Multiple Buildings | 31 | 110,000 | 0 | Replace building directories at AH, ES, OM & PA | |
| 471777 | Grounds | 32 | 40,000 | 0 | Phase 1 replacement of benches on campus | |
| 471779 | Grounds | 33 | 50,000 | 0 | Replace exterior trash cans | |
| 471524 | Multiple Buildings | 34 | 100,000 | 0 | Phase 2 replacement of pneumatic controllers with DDC system | |
| 471527 | Chemistry Building | 35 | 100,000 | 0 | Replace lab vacuum pump and relocate to basement | |
| 472087 | Arntzen Hall | 36 | 380,000 | 0 | Complete exterior renovation | |
| 463840 | Bond Hall | 37 | 40,000 | 0 | Replace clocks | |
| 471887 | Old Main | 38 | 1,610,000 | 0 | Renovate public corridors | |
| 472170 | Parks Hall | 39 | 1,340,000 | 0 | Replace HVAC system | |
| 471540 | Environmental Studies | 40 | 1,070,000 | 0 | Comprehensive interior renovation | |
| 472175 | Fine Arts | 41 | 670,000 | 0 | Comprehensive interior renovation | |
| 467648 | Biology Building | 42 | 24,000 | 0 | Rekey | |
| 460959 | Arntzen Hall | Replace carpet in AH 217, 217a & 217b | The project is merged with a programmatic request by Huxley for this area. | |||
| 472331 | Grounds | Upgrade selected outdoor sculpture | CFPA - maintenance on sculptures does not qualify for capital. | |||
| 471040 | SMATE | Blinds replacement at dome in SL 220 | CST - request for new blinds is bundled within a large project above | |||
| 471514 | Multiple Buildings | Replace carpets in classrooms | Is now bundled with classroom mediation projects | |||
| 463834 | Bond Hall | Replace blinds | CST - request for new blinds is bundled within a large project above | |||
| 472323 | AIC | Upgrade Vivarium exhaust system | Funded in current biennium | |||
| 13,171,000 | 6,746,000 | |||||
| Historic Category Average | ||||||
| Preservation Projects - Health, Safety, Code subcategory | ||||||
| 469818 | 1 | 110,000 | 110,000 | Misc. Emergent HSC | Duplicate of 471089 | |
| 471741 | Utilities | 2 | 98,000 | 98,000 | Upgrade fire alarm & security fiber optic switches | |
| 470513 | Multiple Buildings | 3 | 557,000 | 557,000 | Upgrade access control | May add in other projects when scope is further defined |
| 470971 | College Hall | 4 | 225,000 | 225,000 | Provide fire alarm & detection system - Provide pathways for access control | |
| 470975 | Administrative Services | 5 | 115,000 | 115,000 | Replace aging fire detectors & revise coverage | |
| 470979 | Grounds | 6 | 91,000 | 91,000 | Replace pathways at Birnam Wood | |
| 470996 | Fraser Hall | 7 | 87,000 | 87,000 | Replace aging fire detectors & revise coverage | |
| 471004 | Environmental Studies | 8 | 415,000 | 415,000 | Replace aging fire detectors & revise coverage | |
| 475988 | Grounds | 9 | 0 | 0 | Install handrail between AH and ET | Moved from Program and accomplished with current funds |
| 473327 | Parks Hall | 10 | 95,000 | 95,000 | Several door revisions | |
| 471027 | Campus Services | 11 | 100,000 | 100,000 | Replace aging fire detectors & revise coverage | |
| 477104 | Multiple Buildings | 12 | 75,000 | 75,000 | Replace sink fixtures with high lead in drinking water | |
| 471687 | Multiple Buildings | 13 | 188,000 | 188,000 | Add fall protection to unsafe roofs | |
| 471034 | Grounds | 14 | 688,000 | 688,000 | Replace brick pavers in multiple areas | Focus on front of CV |
| 471202 | Grounds | 15 | 202,000 | 202,000 | Ridgeway sidewalk restoration | |
| 471206 | Campus Services | 16 | 165,000 | 165,000 | Upgrade HVAC to improve IAQ | |
| 471292 | Multiple Buildings | 17 | 911,000 | 911,000 | Locksets and rekey doors | Generalized and increased funding |
| 471273 | Arntzen Hall | 18 | 395,000 | 0 | Replace aging fire detectors & revise coverage | |
| 471301 | Environmental Studies | 19 | 380,000 | 0 | Replace interior locksets and rekey doors | Potentially absorbed into 471292 |
| 471737 | Utilities | 20 | 60,000 | 0 | Lock access to IT and Comm. lines on campus | |
| 471745 | Grounds | 21 | 60,000 | 0 | Handrail on walk between Old Main & Edens Hall | |
| 471277 | Parks Hall/Per. Arts | 22 | 70,000 | 0 | Replace exterior dr. hardware and rough-in for access control | |
| 471397 | Old Main | 23 | 280,000 | 0 | Replace interior locksets and rekey doors | Potentially absorbed into 471292 |
| 464313 | Parks Hall | 24 | 95,000 | 0 | Rekey for safety and security | |
| 471283 | Chemistry Building | 25 | 290,000 | 0 | Separate emergency & stand-by loads on generator | |
| 471400 | Performing Arts | 26 | 250,000 | 0 | Replace interior locksets and rekey doors | Potentially absorbed into 471292 |
| 471759 | Alumni House | 27 | 85,000 | 0 | Add handrail on path from alley to building | |
| 471702 | Multiple Buildings | 28 | 460,000 | 0 | Provide evacuation signage for classrooms & buildings | |
| 469068 | Performing Arts | 29 | 220,000 | 0 | Key card system for Labs PA 166, 168, 170 & 178 | Potentially absorbed into 471292 |
| 471770 | Grounds | 30 | 40,000 | 0 | Resurface existing concrete stairs | |
| 465061 | Fine Arts | 31 | 376,000 | 0 | Portion of unbundled FI projects | |
| 471447 | ||||||
| 466728 | ||||||
| 466740 | ||||||
| 471720 | Carver Gym | Seismic upgrade to 1936 portion of Carver | Included in major capital request | |||
| 473329 | Parks Hall | North stairwell gate | Also included in 473327 | |||
| 467614 | Biology Building | Prox cards at exterior & teaching labs | May be considered as part of 470513 | |||
| 473328 | Parks Hall | Rekey | Duplicate of BFA request | |||
| 465348 | Arntzen Hall | New locks and rekeying | Duplicate of 471292 | |||
| 465372 | Environmental Studies | New locks and rekeying | Duplicate of 471301 | |||
| 465377 | Old Main | Rekeying | Duplicate of 471397 | |||
| 471089 | Misc. Emergent HSC | Duplicate of 469818 | ||||
| 471753 | Carver Gym | Add fall protection and blinds in Carver Gym C | Funded in current biennium | |||
| 471846 | Old Main | Rekeying | Withdrawn by FM | |||
| 480906 | Grounds | Birnam Wood pathway restoration | Duplicate of 470979 | |||
| 7,183,000 | 4,122,000 | |||||
| Historic Category Average | ||||||
| Preservation Projects - Infrastructure Preservation subcategory | ||||||
| 471716 | 1 | 110,000 | 110,000 | Misc. emergent utility improvements | ||
| 471723 | 2 | 110,000 | 110,000 | Misc. emergent grounds improvements | ||
| 471746 | Utilities | 3 | 750,000 | 750,000 | Replace water main near Old Main | |
| 471749 | Utilities | 4 | 185,000 | 185,000 | Upgrade steam distribution system | |
| 471195 | Grounds | 5 | 66,000 | 66,000 | Renovate retaining wall at VU Loading Dock | |
| 471751 | Utilities | 6 | 1,463,000 | 1,463,000 | Replace steam piping at Ridgeway | Need better definition of what other utilities are in roadway? |
| 471766 | Grounds | 7 | 472,000 | 0 | Replace rock retaining wall on Fairhaven service road | |
| 471504 | Fairhaven College | Replace sanitary waste lines | Withdrawn by FM | |||
| 3,156,000 | 2,684,000 | |||||
| Historic Category Average | ||||||
| Total Preservation Category | 23,510,000 | 13,552,000 | ||||
| Programmatic Projects | ||||||
| 464756 | Shannon Point | 1 | 133,000 | 133,000 | SPMC Security Program | |
| 475981 | Grounds | 2 | 125,000 | 125,000 | Misc. Emergent ADA projects | |
| 474611 | Wilson Library | 3 | 735,000 | 735,000 | Consolidate library service desks | |
| 472109 | Environmental Studies | 4 | 208,000 | 208,000 | ES 530 upgrade | |
| 480503 | 5 | 595,000 | 595,000 | Media Production Facility | Location needs to be resolved | |
| 473274 | Old Main | 6 | 1,505,000 | 1,505,000 | disAbility Resources & Student Outreach Services | Dollar amount adjusted |
| 471866 | Grounds | 7 | 380,000 | 380,000 | Pathway lighting for path from Commissary to Birnam Wood | |
| 466343 | Eng. Technology | 8 | 710,000 | 710,000 | Improve ET 304, 321, 322, 327, 328, 332, 333 & 340 for EET | |
| 475121 | Grounds | 9 | 242,000 | 242,000 | Bike shelter fabrication and installation | Scaled down to only top priority locations |
| 471651 | Carver Gym | 10 | 0 | 0 | Biomechanics Lab enhancement | Potentially part of classroom upgrades |
| 469705 | Grounds | 11 | 1,787,000 | 1,787,000 | Multi-use field - Phase 1 | |
| 478135 | Old Main | 12 | 295,000 | 295,000 | Cashier Office upgrades | |
| 473334 | Parks Hall | 13 | 100,000 | 100,000 | Renovate 3rd floor conference rooms 308 & 328 | |
| 471788 | Utilities | 14 | 347,000 | 347,000 | Complete remaining Remote Utility Monitoring | |
| 460967 | Arntzen Hall | 15 | 84,000 | 84,000 | Remodel AH 223+ recarpet AH 217, 217a & 217b | Added 460959 |
| 472523 | Wilson Library | 16 | 0 | 0 | Create a student gallery space within the library | Linked to 472394 |
| 475550 | Carver Gym | 17 | 685,000 | 685,000 | Renovate Men's Locker, Team, & Equipment Rms. | Deleted Training Room |
| 471817 | Environmental Studies | 18 | 31,000 | 31,000 | Add electrical circuits | |
| 472349 | Performing Arts | 19 | 385,000 | 385,000 | Upgrade PA 16 | Estimate excludes choral risers |
| 472394 | Fine Arts | 20 | 412,000 | 412,000 | Renovate FI 118 for Western Gallery Storage | Dependent on 472523 Larger scope approved by Provost |
| 477622 | Old Main | 21 | 276,000 | 276,000 | OM 340 Mediation & lighting | No equipment necessary |
| 466352 | Environmental Studies | 22 | 1,085,000 | 0 | Remodel ES 123 for AMSEC | |
| 471783 | Physical Plant | 23 | 118,000 | 0 | Phase 2 of key security for Physical Plant | |
| 464354 | Fine Arts | 24 | 390,000 | 0 | Portion of unbundled FI projects | |
| 467142 | ||||||
| 471728 | Communications Facility | 25 | 1,500,000 | 0 | Solar shading devices on south and west exterior | |
| 473457 | Old Main | 26 | 500,000 | 0 | Renovation of Admissions office | Dollar amount adjusted |
| 474602 | Wilson Library | 27 | 250,000 | 0 | Relocate Writing Center | |
| 471861 | Grounds | 28 | 800,000 | 0 | Completion of Service Road revisions btwn PH and Rec. w/ west service access to rec. | |
| 478150 | Performing Arts | 29 | 440,000 | 0 | Scalable PA upgrades | Doesn't include cost for 466057 |
| 475557 | Carver Gym | 30 | 735,000 | 0 | Gym "B" lighting improvements | Corridor lighting removed from request and moved to Program |
| 471810 | Utilities | 31 | 40,000 | 0 | Convert tunnel node T-4 to Tunnel Workshop | |
| 471850 | Multiple Buildings | 32 | 260,000 | 0 | Implement recycle pilot program | |
| 471838 | Shannon Point | 33 | 190,000 | 0 | Maintenance vehicle storage facility | |
| 464414 | Bio Greenhouse | 34 | 500,000 | 0 | Research & Teaching Large Equipment Storage Facility | |
| 464747 | Shannon Point | 35 | 420,000 | 0 | Public Education Experiential Learning Laboratory | |
| 471843 | Grounds | 36 | 330,000 | 0 | Relandscape campus entry at Bill McDonald Parkway | |
| 471808 | Physical Plant | 37 | 140,000 | 0 | Update aerial photo & topographic digital projection | |
| 466470 | Eng. Technology | 38 | 525,000 | 0 | Renovate Project Yard & provide secure storage | |
| 479379 | Fairhaven College | 39 | 400,000 | 0 | Create covered outdoor learning space | |
| 473323 | Old Main | 40 | 1,265,000 | 0 | Career Services Center remodel | |
| 475558 | Carver Gym | 41 | 90,000 | 0 | Hallway/Foyer upgrade | Hallway painting already accomplished/priority adjusted |
| 476426 | Old Main | 42 | 75,000 | 0 | Reconfigure OM 450, 470 & 480 areas | |
| 464752 | Shannon Point | 43 | 500,000 | 0 | Expansion of Wet Lab Facilities | |
| 466280 | 44 | 1,950,000 | 0 | New space for Lighting Design Lab | ||
| 465083 | Performing Arts | 45 | 90,000 | 0 | Costume shop: In-shop storage & fabric-dyeing in PA 281 & 281a | |
| 472083 | Grounds | 46 | 1,070,000 | 0 | Replace exterior globe lights | |
| 472480 | Performing Arts | 47 | 1,130,000 | 0 | Refurbish Main Lobby and Mainstage inner Lobby | |
| 471859 | Physical Plant | 48 | 60,000 | 0 | Construction waste recycling station | |
| 473346 | Parks Hall | 49 | 845,000 | 0 | Plaza deck enclosure | |
| 465829 | Fine Arts | 50 | 500,000 | 0 | Improvements to Western Gallery Storage | Isn't necessary if 472394 is completed |
| 473280 | Old Main | 51 | 440,000 | 0 | Registrar's Office reutilization & consolidation | |
| 466568 | Eng. Technology | 52 | 390,000 | 0 | Vehicle Activity Car Port/Enclosing Car Port | |
| 471864 | 53 | 40,000 | 0 | Create central campus materials storage facility for FM | No space identified | |
| 471873 | Physical Plant | 54 | 830,000 | 0 | Replace "Chicken Coop" with metal building | |
| 466365 | Eng. Technology | 55 | 100,000 | 0 | Add chiller to third floor air handler | |
| 479374 | Fairhaven College | 56 | 600,000 | 0 | Renovations to FA 300 Auditorium | |
| 471032 | Old Main | 57 | 75,000 | 0 | Testing Center glass wall installation | |
| 471882 | Grounds | 58 | 330,000 | 0 | Create PA drop-off zone | |
| 475535 | Old Main | 59 | 120,000 | 0 | Revisions to OM 530 suite | |
| 472229 | Canada House | 60 | 1,500,000 | 0 | Renovation of Canada House | |
| 471099 | SMATE | Divide SL 240 into two rooms | Was funded this biennia but delayed because of cost overruns elsewhere. It is now funded again and scheduled for completion this year. | |||
| 477243 | Multiple Buildings | Mediation of Departmental classrooms & labs | Moved to intermediate classroom upgrade project | |||
| 471333 | Communications Facility | 75,000 | Move circuits to generator | Too small for minor works capital | ||
| 469071 | Performing Arts | Wire and equip PA 16 & 47 and install key card access | will be considered as part of larger access control project | |||
| 475987 | Carver Gym | Install elevator | Not feasible as a stand-alone project. Is included in major capital request for Carver Gym | |||
| 463836 | Bond Hall | Remodel BH 175 into conference/seminar space | Is cancelled because it is a General Use Classroom, however Space Admin has ordered tables and chairs for this room which should make it much more useful to the Math Department | |||
| 465653 | Environmental Studies | Mediation for classroom ES 213 | Moved to intermediate classroom project | |||
| 465668 | Environmental Studies | Bench modifications and room mediation for ES 223 | Moved to intermediate classroom project | |||
| 465729 | Environmental Studies | Mediation & cabinets for ES 218 | Moved to intermediate classroom project | |||
| 465754 | Bond Hall | Mediation upgrade to BH 215 | Moved to intermediate classroom project | |||
| 476031 | Administrative Services | Space optimization & consolidation | cancelled | |||
| 480504 | Commissary | Colocate Fairhaven & CFPA Depts at Commissary | cancelled - would require purchasing the Commissary | |||
| 480798 | Art Annex | Art Annex Renovation | Now intermediate/major 467025 | |||
| 471308 | AIC | Provide window screens | Funded in current biennium | |||
| 471854 | Shannon Point | Provide electronic vehicle gate | Duplicate of 464756 | |||
| Program Category Total | 29,733,000 | 9,035,000 | ||||
| Historic Category Average | ||||||
| 53,243,000 | 22,587,000 | |||||