2011-2013 MINOR WORKS PROJECT REQUESTS - PRESERVATION AND PROGRAMMATIC 
  Category request levels as approved by June 2010 BOT
FORM NUMBER BLDG Rec. Ranking   Requested Funding   Recommended Funding PROJECT DESCRIPTION COMMENTS/QUESTIONS
Preservation Projects - Facilities Preservation subcategory
471287 College Hall 1 1,029,000 1,029,000 Replace clay tile roof  
471316 Wilson Library 2 378,000 378,000 Replace main electrical service switchgear  
471323 Arntzen Hall 3 230,000 230,000 Replace main electrical service switchgear  
471418 Administrative Services 4 1,023,000 1,023,000 Central Machine Room infrastructure improvements Verify new number with structural added.
471332 Environmental Studies 5 118,000 118,000 Replace electrical branch panels  
471421 Performing Arts 6 0 0 Exterior renovation  Higher ranked and reduced to zero because of intermediate request
471338 College Hall 7 320,000 320,000 Minor tuckpointing & brick sealing  
471347 Multiple Buildings 8 374,000 374,000 Restroom renewal in multiple buildings  
471353 Multiple Buildings 9 110,000 110,000 Replace condensate receivers at WL, OM & PA  
471361 Eng. Technology 10 250,000 250,000 Correct 3rd floor ventilation problems  
471366 Multiple Buildings 11 213,000 213,000 Phase 1 replacement of pneumatic controllers with DDC system  
479376 Fairhaven College 12 35,000 35,000 Paint exterior of Fairhaven College (1/3 total cost)  
471381 Eng. Technology 13 505,000 505,000 Comprehensive exterior renovation  
471385 Shannon Point 14 272,000 272,000 Replace roof and add insulation  
471393 Multiple Buildings 15 81,000 81,000 Exterior renovation of CA & HR Removed HS due to potential demolition
471405 Multiple Buildings 16 30,000 30,000 Retrofit T-12 lighting  
471408 High Street 17 375,000 375,000 Demolish High Street Hall Requires relocation of occupants
467659 Biology Building 18 280,000 280,000 Environmental Room Upgrades to BI 163, 247, 332, 346, 439 & 464  
465048 Fine Arts 19 27,000 27,000 Painting Studio plumbing  Portion of bundled project
471424 Wilson Library 20 335,000 335,000 Replace clay tile roof  
471438 Haggard Hall 21 203,000 203,000 Refurbish roof  
471415 Hannegan Road 22 223,000 223,000 Demolish Hannegan Road Residence  
471445 Chemistry Building 23 0 0 Final phase of exterior renovation Exterior already complete
471483 Steam Plant 24 65,000 65,000 Replace roof over 2nd floor offices  
471488 Multiple Buildings 25 270,000 270,000 Replace blinds in numerous buildings Includes 471040 & 463834
471496 Arntzen Hall 26 56,000 0 Replace linoleum in restrooms  
471501 Shannon Point 27 395,000 0 Replace main electrical service switchgear  
471503 Fraser Hall 28          290,000 0 Upgrade HVAC systems  
471508 Fraser Hall 29          110,000 0 Comprehensive interior renovation  
471511 Performing Arts 30            40,000 0 Restroom renewal  
471519 Multiple Buildings 31          110,000 0 Replace building directories at AH, ES, OM & PA  
471777 Grounds 32            40,000 0 Phase 1 replacement of benches on campus  
471779 Grounds 33            50,000 0 Replace exterior trash cans  
471524 Multiple Buildings 34          100,000 0 Phase 2 replacement of pneumatic controllers with DDC system  
471527 Chemistry Building 35          100,000 0 Replace lab vacuum pump and relocate to basement  
472087 Arntzen Hall 36          380,000 0 Complete exterior renovation  
463840 Bond Hall 37            40,000 0 Replace clocks  
471887 Old Main 38       1,610,000 0 Renovate public corridors  
472170 Parks Hall 39       1,340,000 0 Replace HVAC system  
471540 Environmental Studies 40       1,070,000 0 Comprehensive interior renovation  
472175 Fine Arts 41          670,000 0 Comprehensive interior renovation  
467648 Biology Building 42            24,000 0 Rekey  
460959 Arntzen Hall       Replace carpet in AH 217, 217a & 217b The project is merged with a programmatic request by Huxley for this area.
472331 Grounds       Upgrade selected outdoor sculpture CFPA - maintenance on sculptures does not qualify for capital.  
471040 SMATE       Blinds replacement at dome in SL 220 CST - request for new blinds is bundled within a large project above
471514 Multiple Buildings       Replace carpets in classrooms Is now bundled with classroom mediation projects
463834 Bond Hall       Replace blinds CST - request for new blinds is bundled within a large project above
472323 AIC       Upgrade Vivarium exhaust system Funded in current biennium
      13,171,000 6,746,000
Historic Category Average   
Preservation Projects - Health, Safety, Code subcategory
469818   1 110,000 110,000 Misc. Emergent HSC Duplicate of 471089
471741 Utilities 2 98,000 98,000 Upgrade fire alarm & security fiber optic switches  
470513 Multiple Buildings 3 557,000 557,000 Upgrade access control May add in other projects when scope is further defined
470971 College Hall 4 225,000 225,000 Provide fire alarm & detection system - Provide pathways for access control  
470975 Administrative Services 5 115,000 115,000 Replace aging fire detectors & revise coverage  
470979 Grounds 6 91,000 91,000 Replace pathways at Birnam Wood  
470996 Fraser Hall 7 87,000 87,000 Replace aging fire detectors & revise coverage  
471004 Environmental Studies 8 415,000 415,000 Replace aging fire detectors & revise coverage  
475988 Grounds 9 0 0 Install handrail between AH and ET Moved from Program and accomplished with current funds
473327 Parks Hall 10 95,000 95,000 Several door revisions  
471027 Campus Services 11 100,000 100,000 Replace aging fire detectors & revise coverage  
477104 Multiple Buildings 12 75,000 75,000 Replace sink fixtures with high lead in drinking water  
471687 Multiple Buildings 13 188,000 188,000 Add fall protection to unsafe roofs  
471034 Grounds 14 688,000 688,000 Replace brick pavers in multiple areas Focus on front of CV
471202 Grounds 15 202,000 202,000 Ridgeway sidewalk restoration  
471206 Campus Services 16 165,000 165,000 Upgrade HVAC to improve IAQ  
471292 Multiple Buildings 17 911,000 911,000 Locksets and rekey doors Generalized and increased funding
471273 Arntzen Hall 18 395,000 0 Replace aging fire detectors & revise coverage  
471301 Environmental Studies 19          380,000 0 Replace interior locksets and rekey doors Potentially absorbed into 471292
471737 Utilities 20            60,000 0 Lock access to IT and Comm. lines on campus  
471745 Grounds 21            60,000 0 Handrail on walk between Old Main & Edens Hall  
471277 Parks Hall/Per. Arts 22            70,000 0 Replace exterior dr. hardware and rough-in for access control  
471397 Old Main 23          280,000 0 Replace interior locksets and rekey doors Potentially absorbed into 471292
464313 Parks Hall 24            95,000 0 Rekey for safety and security  
471283 Chemistry Building 25          290,000 0 Separate emergency & stand-by loads on generator  
471400 Performing Arts 26          250,000 0 Replace interior locksets and rekey doors Potentially absorbed into 471292
471759 Alumni House 27            85,000 0 Add handrail on path from alley to building  
471702 Multiple Buildings 28          460,000 0 Provide evacuation signage for classrooms & buildings  
469068 Performing Arts 29          220,000 0 Key card system for Labs PA 166, 168, 170 & 178 Potentially absorbed into 471292
471770 Grounds 30            40,000 0 Resurface existing concrete stairs  
465061 Fine Arts 31          376,000 0 Portion of unbundled FI projects  
471447
466728
466740
471720 Carver Gym       Seismic upgrade to 1936 portion of Carver Included in major capital request
473329 Parks Hall       North stairwell gate Also included in 473327
467614 Biology Building       Prox cards at exterior & teaching labs May be considered as part of 470513
473328 Parks Hall       Rekey Duplicate of BFA request
465348 Arntzen Hall       New locks and rekeying Duplicate of 471292
465372 Environmental Studies       New locks and rekeying Duplicate of 471301
465377 Old Main       Rekeying Duplicate of 471397
471089         Misc. Emergent HSC Duplicate of 469818
471753 Carver Gym       Add fall protection and blinds in Carver Gym C Funded in current biennium
471846 Old Main       Rekeying Withdrawn by FM
480906 Grounds       Birnam Wood pathway restoration Duplicate of 470979
        7,183,000 4,122,000
Historic Category Average
Preservation Projects - Infrastructure Preservation subcategory
471716   1 110,000 110,000 Misc. emergent utility improvements  
471723   2 110,000 110,000 Misc. emergent grounds improvements  
471746 Utilities 3 750,000 750,000 Replace water main near Old Main  
471749 Utilities 4 185,000 185,000 Upgrade steam distribution system  
471195 Grounds 5 66,000 66,000 Renovate retaining wall at VU Loading Dock  
471751 Utilities 6 1,463,000 1,463,000 Replace steam piping at Ridgeway Need better definition of what other utilities are in roadway?
471766 Grounds 7 472,000 0 Replace rock retaining wall on Fairhaven service road  
471504 Fairhaven College       Replace sanitary waste lines Withdrawn by FM
        3,156,000 2,684,000
Historic Category Average
Total Preservation Category     23,510,000 13,552,000
Programmatic Projects
464756 Shannon Point 1 133,000 133,000 SPMC Security Program  
475981 Grounds 2 125,000 125,000 Misc. Emergent ADA projects  
474611 Wilson Library 3 735,000 735,000 Consolidate library service desks  
472109 Environmental Studies 4 208,000 208,000 ES 530 upgrade  
480503   5 595,000 595,000 Media Production Facility Location needs to be resolved
473274 Old Main 6 1,505,000 1,505,000 disAbility Resources & Student Outreach Services Dollar amount adjusted
471866 Grounds 7 380,000 380,000 Pathway lighting for path from Commissary to Birnam Wood  
466343 Eng. Technology 8 710,000 710,000 Improve ET 304, 321, 322, 327, 328, 332, 333 & 340 for EET  
475121 Grounds 9 242,000 242,000 Bike shelter fabrication and installation Scaled down to only top priority locations
471651 Carver Gym 10 0 0 Biomechanics Lab enhancement Potentially part of classroom upgrades
469705 Grounds 11 1,787,000 1,787,000 Multi-use field - Phase 1  
478135 Old Main 12 295,000 295,000 Cashier Office upgrades  
473334 Parks Hall 13 100,000 100,000 Renovate 3rd floor conference rooms 308 & 328  
471788 Utilities 14 347,000 347,000 Complete remaining Remote Utility Monitoring  
460967 Arntzen Hall 15 84,000 84,000 Remodel AH 223+ recarpet AH 217, 217a & 217b Added 460959
472523 Wilson Library 16 0 0 Create a student gallery space within the library Linked to 472394
475550 Carver Gym 17 685,000 685,000 Renovate Men's Locker, Team, & Equipment Rms. Deleted Training Room
471817 Environmental Studies 18 31,000 31,000 Add electrical circuits  
472349 Performing Arts 19 385,000 385,000 Upgrade PA 16 Estimate excludes choral risers
472394 Fine Arts 20 412,000 412,000 Renovate FI 118 for Western Gallery Storage Dependent on 472523 Larger scope approved by Provost
477622 Old Main 21 276,000 276,000 OM 340 Mediation & lighting No equipment necessary
466352 Environmental Studies 22 1,085,000 0 Remodel ES 123 for AMSEC  
471783 Physical Plant 23 118,000 0 Phase 2 of key security for Physical Plant  
464354 Fine Arts 24 390,000 0 Portion of unbundled FI projects  
467142
471728 Communications Facility 25       1,500,000 0 Solar shading devices on south and west exterior  
473457 Old Main 26          500,000 0 Renovation of Admissions office Dollar amount adjusted
474602 Wilson Library 27          250,000 0 Relocate Writing Center  
471861 Grounds 28          800,000 0 Completion of Service Road revisions btwn PH and Rec. w/ west service access to rec.  
478150 Performing Arts 29          440,000 0 Scalable PA upgrades Doesn't include cost for 466057
475557 Carver Gym 30          735,000 0 Gym "B" lighting improvements Corridor lighting removed from request and moved to Program
471810 Utilities 31            40,000 0 Convert tunnel node T-4 to Tunnel Workshop  
471850 Multiple Buildings 32          260,000 0 Implement recycle pilot program  
471838 Shannon Point 33          190,000 0 Maintenance vehicle storage facility  
464414 Bio Greenhouse 34          500,000 0 Research & Teaching Large Equipment Storage Facility  
464747 Shannon Point 35          420,000 0 Public Education Experiential Learning Laboratory  
471843 Grounds 36          330,000 0 Relandscape campus entry at Bill McDonald Parkway  
471808 Physical Plant 37          140,000 0 Update aerial photo & topographic digital projection   
466470 Eng. Technology 38          525,000 0 Renovate Project Yard & provide secure storage  
479379 Fairhaven College 39          400,000 0 Create covered outdoor learning space  
473323 Old Main 40       1,265,000 0 Career Services Center remodel  
475558 Carver Gym 41            90,000 0 Hallway/Foyer upgrade Hallway painting already accomplished/priority adjusted
476426 Old Main 42            75,000 0 Reconfigure OM 450, 470 & 480 areas  
464752 Shannon Point 43          500,000 0 Expansion of Wet Lab Facilities  
466280   44       1,950,000 0 New space for Lighting Design Lab  
465083 Performing Arts 45            90,000 0 Costume shop: In-shop storage & fabric-dyeing in PA 281 & 281a  
472083 Grounds 46       1,070,000 0 Replace exterior globe lights  
472480 Performing Arts 47       1,130,000 0 Refurbish Main Lobby and Mainstage inner Lobby  
471859 Physical Plant 48            60,000 0 Construction waste recycling station  
473346 Parks Hall 49          845,000 0 Plaza deck enclosure  
465829 Fine Arts 50          500,000 0 Improvements to Western Gallery Storage Isn't necessary if 472394 is completed
473280 Old Main 51          440,000 0 Registrar's Office reutilization & consolidation  
466568 Eng. Technology 52          390,000 0 Vehicle Activity Car Port/Enclosing Car Port  
471864   53            40,000 0 Create central campus materials storage facility for FM No space identified
471873 Physical Plant 54          830,000 0 Replace "Chicken Coop" with metal building  
466365 Eng. Technology 55          100,000 0 Add chiller to third floor air handler  
479374 Fairhaven College 56          600,000 0 Renovations to FA 300 Auditorium  
471032 Old Main 57            75,000 0 Testing Center glass wall installation  
471882 Grounds 58          330,000 0 Create PA drop-off zone  
475535 Old Main 59          120,000 0 Revisions to OM 530 suite  
472229 Canada House 60       1,500,000 0 Renovation of Canada House  
471099 SMATE       Divide SL 240 into two rooms Was funded this biennia but delayed because of cost overruns elsewhere.  It is now funded again and scheduled for completion this year.
477243 Multiple Buildings       Mediation of Departmental classrooms & labs Moved to intermediate classroom upgrade project
471333 Communications Facility   75,000   Move circuits to generator Too small for minor works capital
469071 Performing Arts       Wire and equip PA 16 & 47 and install key card access will be considered as part of larger access control project
475987 Carver Gym       Install elevator Not feasible as a stand-alone project.  Is included in major capital request for Carver Gym
463836 Bond Hall       Remodel BH 175 into conference/seminar space Is cancelled because it is a General Use Classroom, however Space Admin has ordered tables and chairs for this room which should make it much more useful to the Math Department
465653 Environmental Studies       Mediation for classroom ES 213 Moved to intermediate classroom project
465668 Environmental Studies       Bench modifications and room mediation for ES 223 Moved to intermediate classroom project
465729 Environmental Studies       Mediation & cabinets for ES 218 Moved to intermediate classroom project
465754 Bond Hall       Mediation upgrade to BH 215 Moved to intermediate classroom project
476031 Administrative Services       Space optimization & consolidation cancelled
480504 Commissary       Colocate Fairhaven & CFPA Depts at Commissary cancelled - would require purchasing the Commissary
480798 Art Annex       Art Annex Renovation Now intermediate/major 467025
471308 AIC       Provide window screens Funded in current biennium
471854 Shannon Point       Provide electronic vehicle gate Duplicate of 464756
Program Category Total     29,733,000 9,035,000
Historic Category Average
    53,243,000 22,587,000